Escape The Room Employees, what is the weirdest thing you've seen someone do in one of the rooms?

After reading all these horror stories here, I remembered my last group project. We were 4 at the beginning. 1 dropped the class, 1 didn't care much about the project and did nothing.

The real problem was, me and the other person worked above and beyond the requirements. And we had different visions about it. He was planning a dead serious project while what I had in mind was 98% shitpost and 115% amazing.

The compromise we had was, I designed the project and he made the presentation waaaay serious.

Anyways, in the end; it turned out our professor didn't care about serious stuff and said "Everyone can code, I don't care about it. Show me what's unique." to some other group. I turned to my friend, said suck it and proceeded to improv 50% the presentation. Even used some french proverbs.


While it's not as big as your average projects. What we were asked to do was an OpenGL program that had 3 objects that can move, 2 different shader modes and free camera.

What we did was this: https://www.youtube.com/watch?v=1P7hUffq24M&list=PL5zLTlaCwnmI4xxgbhspZGImHZlPzjsyr

It got 115 over 100. tl,dr Everyone else slacking is usually better than 2 people trying hard.

/r/AskReddit Thread Parent